Yucca Growth Infrastructure, LLC-YGI Microgrid Air Quality Construction Permit Application

29172 Results

Sort:

Comment From: Melanie Lewis

7/06/26 @ 8:15 PM
Dear NMED staff,
My name is Melanie Lewis, and I live at 931 11th Street NW, Abq., NM. I am writing because of extreme concerns that Project
Jupiter poses to New Mexicans. I am submitting this comment to urge the New Mexico Environment Department ...↓
No attachments

Comment From: Merna Brostoff

7/06/26 @ 8:14 PM

I urge the NMED to deny Air Quality Construction Permit Application 10883 for the Yucca Growth Infrastructure (YGI) Microgrid in southern Doña Ana County. Granting a permit to emit over 10 million metric tons of CO2 annually violates NMED's mission t...↓
No attachments

Comment From: Jordan Swanson

7/06/26 @ 8:14 PM
Deny this permit.
No attachments

Comment From: Jennifer Biever

7/06/26 @ 8:14 PM
Comment Submitted on behalf of Yucca Growth Infrastructure, LLC

Company: Yucca Growth Infrastructure, LLC
Facility: YGI Microgrid
Permit No. 10883

This comment is submitted on behalf of Yucca Growth Infrastructure, LLC ("YGI"). YGI submitted the...↓
No attachments

Comment From: Daniel Heigher

7/06/26 @ 8:14 PM
Many New Mexicans and I will stand up against this data center! It's not good for anybody but corporations and institutions to continue exploiting the people and lands of New Mexico. The people running this project are being dishonest and cannot be t...↓
No attachments

Comment From: Riley McKinstry

7/06/26 @ 8:14 PM
As a permanent resident of the beautiful state of New Mexico, I vehemently oppose the consideration of the construction permit application filed by Yucca Growth Infrastructure, LLC. The purpose of the project does not warrant the immense environmenta...↓
No attachments

Comment From: Francis Fuchs

7/06/26 @ 8:13 PM
Please don't grant this air quality permit. The impact to the environment is too great.
No attachments

Comment From: Ashley Wegele

7/06/26 @ 8:12 PM
I am against approving the air quality permit application for Yucca Growth Infrastructure. 'Project Jupiter' is one of the last things our state needs. Air quality is already poor due to ozone, wildfire smoke, and other pollutants throughout the year...↓
No attachments

Comment From: William Seward

7/06/26 @ 8:12 PM
A data center would put a strain on already scarce water resources and consume exorbitant amounts of electricity. This construction is not in the best interest of New Mexicans and should be stopped.
No attachments

Comment From: Lorenzo Alba, Jr.

7/06/26 @ 8:11 PM
July 1, 2026
New Mexico Environmental Improvement Board
c/o New Mexico Environment Department
1190 St. Francis Drive, Suite N4050
Santa Fe, NM 87505

Re: Public Comment on Support of Air Quality Permit Applications for Project
Jupiter (Yucca Growth I...↓
Attachments:

Comment From: Ben Brennan

7/06/26 @ 8:11 PM
I am writing in firm opposition to the Yucca Growth Infrastructure, LLC-YGI Microgrid Air Quality Construction Permit Application. Considering that this project is estimated to emit more greenhouse gases than two of the state's largest cities combine...↓
No attachments

Comment From: Miranda Padilla

7/06/26 @ 8:10 PM
New Mexico is a land of many people, people who have already been at the forefront of nuclear colonization. Our people have been suffering from ill decisions for generations. Our states precious land, water and people are worth more than any dollar. ...↓
No attachments

Comment From: Donna Roxey

7/06/26 @ 8:10 PM
Deny this reckless permit.
No attachments

Comment From: lauren Stutzman

7/06/26 @ 8:10 PM
As a longtime New Mexico resident, I strongly oppose the Project Jupiter data center. We cannot waste water or destroy the environment and landscape to line the pockets of out of state interests that care nothing for this land.

No attachments

Comment From: Colleen Wolf

7/06/26 @ 8:09 PM
I firmly do not support Project Jupiter. Data centers value profit over the environment and New Mexico citizens. Our valuable natural resources should be prioritized for local use rather than for a capitalistic company.
No attachments

Comment From: Evany Lopez

7/06/26 @ 8:09 PM
we don't need another wack ass data center taking resources from the people of new mexico
No attachments

Comment From: Laura Christison

7/06/26 @ 8:09 PM
I strongly oppose granting this permit application. It is not good for our environment, it's not good for New Mexico.
No attachments

Comment From: Andrea Martinez

7/06/26 @ 8:09 PM
I stand against this!! NM is in danger by this and other projects that will literally destroy and make NM uninhabitable for all life. NM is our home! Stop destroying it's future.
No attachments

Comment From: Martha Patterson

7/06/26 @ 8:08 PM
New mexico already lives in both a drought and water debt. Building a massive data center will only exacerbate these already existing issues. The people who suffer the most from these choices are neighbors to all of us. We've seen the impact on commu...↓
No attachments

Comment From: Lilibeth Sanchez

7/06/26 @ 8:08 PM
I am writing to VEHEMENTLY OPPOSE this project. It is unbelievable that in the driest part of the country, where water is practically non-existent (have you seen the Rio Grande lately?!?), there is this ridiculous proposal to build a facility that wi...↓
No attachments

Comment From: Rachel Hendrix

7/06/26 @ 8:08 PM
Please deny the air quality permits for Yucca Growth Infrastructure, LLC. This project does nothing to benefit New Mexico and only endangers NM citizens in the long run. Water resources should be carefully conserved instead of used for data centers t...↓
No attachments

Comment From: Maria Elena Johnson

7/06/26 @ 8:07 PM
This application needs to be withdrawn. The entire process from the beginning has been froth with double speak and half truths. Everyone involved who attempted to get the project by the communities should lose their privilege to hold office in South...↓
No attachments

Comment From: Eric Nussbickel

7/06/26 @ 8:07 PM
As a citizen, I vehemently oppose this application. It should be denied for the good of the entire state of New Mexico..
No attachments

Comment From: Rachel Hendrix

7/06/26 @ 8:07 PM
Please deny the air quality permits for Yucca Growth Infrastructure, LLC. This project does nothing to benefit New Mexico and only endangers NM citizens in the long run. Water resources should be carefully conserved instead of used for data centers t...↓
No attachments

Comment From: Madison Emond

7/06/26 @ 8:06 PM
Do not do this! The Rio Grande is DRY! We have no water to spare! The water we have is for the crops, for people to drink, for the river to be full again. I cannot believe that we went from a prospective green energy revolution to the rapid developme...↓
No attachments

Comment From: Sharon James

7/06/26 @ 8:06 PM
Attachments:

Comment From: Eva Keltner

7/06/26 @ 8:05 PM
New Mexican habitat should be preserved. The data center is a threat to our bird population and other species special to New Mexico and Dona Ana county. Not to even mention the threat it had on our water, which is already being threatened by climate ...↓
No attachments

Comment From: Amelia Amelia

7/06/26 @ 8:04 PM
Project JUPITER is harmful to the environment and all living things around it. Listen to the community that lives here.We reject Project JUPITER. Fresh drinking water is more important than a data center. New mexians do not want this project to conti...↓
No attachments

Comment From: Isabella Lanier

7/06/26 @ 8:04 PM
Installing a data center here in New Mexico is insanely cruel to the people that live here. We are already struggling as it is with our limited resources and giving them all to a data center is not going to benefit us at ALL. We deserve clean air, an...↓
No attachments

Comment From: Daniel Kim

7/06/26 @ 8:04 PM
This entire project has been deceptively represented to officials and the public, and has no merit . It will be damaging to air and water quality, and must be denied.
No attachments

Comment From: Joshua Wallace

7/06/26 @ 8:04 PM
As I understand, the microgrid that would be enabled by this permit will have carbon dioxide emissions on par with that from both of New Mexico's biggest cities.

These cities have well over half a million residents, and tons of businesses within th...↓
No attachments

Comment From: Simon Riley

7/06/26 @ 8:03 PM
I am submitting this comment to express my opposition of YGI's Application. I demand you to also reject the Yucca Growth Infrastructure, LLC-YGI Microgrid Air Quality Construction Permit Application.

YGI's application should be denied by NMED becaus...↓
No attachments

Comment From: Michael Pacheco

7/06/26 @ 8:02 PM
Please put the community and people over the profits of some private companies
No attachments

Comment From: Rene Thompson

7/06/26 @ 8:02 PM
Permitting this project will ruin our state, land, watet and the environment if allowed.
Please dont let this happen to New Mexico like its happened to other states already.
No attachments

Comment From: Brianna Santillanes

7/06/26 @ 8:01 PM
This is a massive project that will forever change the trajectory of New Mexico's future, its environment, and its livability for its residents. We already have ample evidence of the devastating consequences these kinds of mega data centers have on t...↓
No attachments

Comment From: Bill Guerra-Addington

7/06/26 @ 8:01 PM
Dear New Mexico environment department,
I live near Sunland Park Drive in El Paso, Texas just a few miles from Project Jupiter in the desert near Sunland Park, New Mexico. I am opposed to this project and have deep air quality concerns
regarding th...↓
No attachments

Comment From: Brad Louis

7/06/26 @ 8:00 PM
The New Mexico Environment Department must reject the air quality permit for Project Jupiter.
Our communities should not have to sacrifice clean air, public health, and precious natural
resources for a project that raises serious concerns about pollu...↓
No attachments

Comment From: Dolores Lara

7/06/26 @ 7:59 PM
To Whom It May Concern,
Project Jupiter would be deeply destructive to our New Mexican communities and environment. The proposed location for Project Jupiter is in a community that has been fighting for clean drinking water. The project would pollut...↓
No attachments

Comment From: Kevin Washburn

7/06/26 @ 7:58 PM
This will be the third comment I have submitted, one of them a twist on the comment supplied by Project Jupiter themselves and the other simply stating "Please leave".

I, and everyone else I know personally, want Project Jupiter out. Not just them,...↓
No attachments

Comment From: Alex Keller

7/06/26 @ 7:58 PM
Dear NMED,

I am submitting this comment to express my opposition of YGI's Application. I strongly urge you to also reject the Yucca Growth Infrastructure, LLC-YGI Microgrid Air Quality Construction Permit Application.

YGI's application should be de...↓
No attachments

Comment From: Farah Karim

7/06/26 @ 7:56 PM
I am submitting this comment to express my strong opposition of YGI's Application. I implore you to also reject the Yucca Growth Infrastructure, LLC-YGI Microgrid Air Quality Construction Permit Application.

YGI's application should be denied by NME...↓
No attachments

Comment From: Kyle Garrick

7/06/26 @ 7:54 PM
I am submitting this comment to express my opposition of YGI's Application. I implore you to also reject the Yucca Growth Infrastructure, LLC-YGI Microgrid Air Quality Construction Permit Application.

YGI's application should be denied by NMED becau...↓
No attachments

Comment From: Ezekiel Acosta

7/06/26 @ 7:53 PM
I am against the construction of Project Jupiter and any further investment in advertising, planning, or proposing of the project. This is a threat to our state's limited resources. Similar to the nuclear labs here, "job" creation would come at the e...↓
No attachments

Comment From: Lizzy Hines

7/06/26 @ 7:51 PM
I vehemently oppose the building of Project Jupiter's data center. We do not have answers or evidence that this will be a constructive, clean action for our communities and the greater state of New Mexico, and therefore we should not be moving forwar...↓
No attachments

Comment From: Bethany Rennaker

7/06/26 @ 7:51 PM
No data centers. Tired of seeing Project Jupiter propaganda.
No attachments

Comment From: Alexandra Hess

7/06/26 @ 7:50 PM
I'm a lifelong New Mexico resident who cares deeply about these lands and about the well-being of all who call them home. I'm also a public health researcher and attorney, and I spend my time working to understand the connection between governmental ...↓
No attachments

Comment From: Chavonne Harroun

7/06/26 @ 7:50 PM
As a longtime resident of New Mexico I feel very strongly that this application should be denied. We need to protect our air quality, precious water, and all of our limited resources in New Mexico. We need to prioritize the use of resources for indus...↓
No attachments

Comment From: Estevan Soto

7/06/26 @ 7:50 PM
No Project Jupiter!!!! No data centers in NM!!!
Water and air are for people, not structures meant to sequester data stolen from people all over the state and country!!!
Do not allow these billionaires to have their way over the will of the people!!...↓
No attachments

Comment From: Kaya Gaskins

7/06/26 @ 7:48 PM
I do not support Project Jupiter since it will take our clean water and harm our planet.
No attachments

Comment From: TYLER THIRLOWAY

7/06/26 @ 7:48 PM
No data centers in New Mexico!
No attachments

Comment From: Christine Laffler

7/06/26 @ 7:48 PM
I oppose.
No attachments

Comment From: Denali Wilson

7/06/26 @ 7:48 PM
I am asking you to deny the air quality construction permit for this applicant. I am a resident of Dona Ana County, where I grew up and am proud to still live with three generations of my family. Already, the summers are unrecognizable from those of ...↓
No attachments

Comment From: Rachel Hickman

7/06/26 @ 7:47 PM
Joining the voices of many, many neighbors near and far, I urge the NMED to deny this permit application for the YGI Microgrid. Our Rio is dry and our valleys already have poor air quality, blown in from increasing fires, blowing dust, and pollution....↓
No attachments

Comment From: Michael Madrigal

7/06/26 @ 7:47 PM
Do not approve this permit. Just don't do it.
No attachments

Comment From: Matthew Harder

7/06/26 @ 7:47 PM
This permit should be denied as it will be harmful to all those living in the area. The negative effects of air quality near gas power plants have been well proven with nitrous oxides and particulate matter hurting anyone downwind, but this microgrid...↓
No attachments

Comment From: Andrew Johnson-Schmit

7/06/26 @ 7:47 PM
The Southwest is already having water resource issues that will be near impossible to meet in the years ahead because of the historic drought and increasing effects of global warming. This project is unnecessary, makes the current calamitous situatio...↓
No attachments

Comment From: Crystal Almeida

7/06/26 @ 7:44 PM
As someone who as asthma, clean air is a strong priority for me. Everyone should have the right to unpolluted air. Project Jupiter does not align with these values. New Mexican citizens do not want their home to be technical industries play ground. I...↓
No attachments

Comment From: Sheila A henke

7/06/26 @ 7:44 PM
I am writing to submit my strong objection to this entire disastrous project. Our beautiful state cannot withstand the damage to our precious resources that would incur should Project Jupiter be allowed to continue to move forward.
In addition, it w...↓
No attachments

Comment From: Jane Baechle

7/06/26 @ 7:44 PM
Project Jupiter represents an environmental disaster for Dona Ana County and New Mexico. There is no benefit to NM residents to projects which use large quantities of scarce and dwindling supplies of water and pollute the air.
No attachments

Comment From: Sarah Lujan

7/06/26 @ 7:43 PM
I oppose this application. We will not sacrifice the environment for this project. It is not wanted or needed here
No attachments

Comment From: Aye Sundram

7/06/26 @ 7:43 PM
New Mexico needs its precious water for people, plants, and aninals. Please deny any and all permits for this project and for any future data centers, AI projects/companies, large scale servers - any construction where the water use will go to machin...↓
No attachments

Comment From: Liam Covey-Shannon

7/06/26 @ 7:43 PM
I am diametrically opposed to the Yucca Growth Infrastructure, LLC-YGI Microgrid Air Quality Construction Permit Application, as it was submitted with false claims regarding the volume of greenhouse gases produced and the quality index created with t...↓
No attachments

Comment From: Paula Seaton

7/06/26 @ 7:42 PM
NM Environment Department, Air Quality Bureau

The air quality permit application for the Project Jupiter Data Center projects that air emissions will exceed the combined emissions of Albuquerque and Las Cruces. Project Jupiter is being built in San...↓
No attachments

Comment From: Phillip Graves

7/06/26 @ 7:42 PM
To the staff of the NMED,

I am writing to strongly urge that you reject the Yucca Growth Infrastructure, LLC-YGI Microgrid Air Quality Construction Permit Application. The exploitative nature of this project is clear and the repercussions will last ...↓
No attachments

Comment From: Hoka Skenandore

7/06/26 @ 7:42 PM
Project Jupiter made it's first mistake by assuming it would be able to add an unwanted data center to a desert that already has limited water for many communities. The next mistake was attempting to name the project after a local indigenous Nation, ...↓
No attachments

Comment From: Natasha Souther

7/06/26 @ 7:41 PM
Allowing this permit does nothing to help New Mexicans, other than robs us of our water. The propaganda campaign that it's a "better" data center is currently preying on our community.
No attachments

Comment From: Natasha Parker

7/06/26 @ 7:40 PM

I am in complete opposition to the Yucca Growth Infrastructure, LLC-YGI Microgrid Air Quality Construction Permit Application. Please deny this application as YGI failed to include all relevant information about Bloom Energy's problematic history, an...↓
No attachments

Comment From: Haley Erwin

7/06/26 @ 7:40 PM
Data centers are a blight on society and their only use is to inflate the egos of sociopathic billionaires.
No attachments

Comment From: Kathe Stark

7/06/26 @ 7:40 PM
Please do not approve the permit. there have been so many lies told, so many closed door meetings out of view of the public, and our air quality in addition to water and electrical needs of this community, many of whom are poor, need to be considere...↓
No attachments

Comment From: Christian Erwin

7/06/26 @ 7:39 PM
I oppose any and all data centers being built in New Mexico, we are in a desert and currently experiencing a drought, a data center would be disastrous for our community.
No attachments

Comment From: Yvonne Morales

7/06/26 @ 7:39 PM

I am submitting this comment to share my opposition to the Yucca Growth Infrastructure, LLC-YGI Microgrid Air Quality Construction Permit Application. Please deny this application for the following reasons:

*YGI's application should be denied by NM...↓
No attachments

Comment From: Amanda Bans

7/06/26 @ 7:39 PM
As a resident of New Mexico I feel very strongly that this application should be denied. We need to protect our air quality, precious water, and all of our limited resources in New Mexico. We need to prioritize the use of resources for industries tha...↓
No attachments

Comment From: Aeyeshia Montalvo

7/06/26 @ 7:39 PM
I am against Project Jupiter.
Project Jupiter harms New Mexico. Project Jupiter releases hazardous pollutants such as nitrous oxide and carbon monoxide into New Mexico's air. Project Jupiter's greenhouse gas emissions would exceed in polluting New ...↓
No attachments

Comment From: Jessica Aguirre

7/06/26 @ 7:37 PM
I urge the New Mexico Environment to reject the Yucca Growth Infrastructure, LLC-YGI Microgrid Air Quality Construction Permit Application. The short term economical benefit to a very small minority, is not worth the potentially devastating environme...↓
No attachments

Comment From: Daniel Roper

7/06/26 @ 7:37 PM
I strongly oppose the Yucca Growth Infrastructure, LLC-YGI Microgrid Air Quality Construction Permit Application. While fuel cells are comparatively clean in emission of fine particulates, they are in no way "green" as they are powered by fossil fuel...↓
No attachments

Comment From: Jared Conahan

7/06/26 @ 7:36 PM
As a lifelong New Mexican I urge the NMED to reject this proposal. The state is already greatly suffering the effects of human-caused climate change; we do not need another facility feigning environmental concern and pumping out carbon emissions, as ...↓
No attachments

Comment From: John Marston

7/06/26 @ 7:35 PM
NMED,

I am writing in order to urge you to outright reject Yucca Growth Infrastructure, LLC-YGI Microgrid Air Quality Construction Permit Application. This project is nothing short of evil, all for the sake of money for the big juicy companies who c...↓
No attachments

Comment From: Tenika Sosa-Gonzalez

7/06/26 @ 7:35 PM
As a south valley resident and co-owner of a business who profits from moving heavy equipment for infrastructure and new developments, I stand strongly opposed to granting this permit.
The long term health and wellbeing of my children and community ...↓
No attachments

Comment From: Jacob Jacob

7/06/26 @ 7:34 PM
New Mexico, in the midst of a decades long drought, doesn't need another source of pollution nor doesn't it need another means of draining our water. We as a state have been explored enough. Please, reconsider the long term ramifications on our alrea...↓
No attachments

Comment From: J K

7/06/26 @ 7:34 PM
Adding this to an already stressed air quality area, in addition to other existing and proposed systems in the region will inevitably impact the residents and wildlife negatively. Requesting you deny this permit.
No attachments

Comment From: Kimmuriel Oblodera

7/06/26 @ 7:34 PM
Dear NMED,

I am writing to you to urge you to deny project jupiter and all proposals associated with it. At this point, this comment section is a complete joke. These corpulent disgusting companies are not getting the support the want, so they are r...↓
No attachments

Comment From: Joseph Ballew

7/06/26 @ 7:33 PM
New mexico doesn't need to be using precious water for data centers
No attachments

Comment From: Patricia Nunez-Quezada

7/06/26 @ 7:32 PM
I am writing to voice my opposition to Project Jupiter.

It will be a detriment to our water, environment, and the well-being of all living beings of New Mexico.

Vote against project Jupiter.
No attachments

Comment From: Dante Archuleta

7/06/26 @ 7:32 PM
Do not allow a data center in NM. Straining a desert's resources in a drought and in the face of climate change is irresponsible to the citizens who live and raise families here
No attachments

Comment From: Lee Wilson

7/06/26 @ 7:31 PM
Dear NMED staff,
My name is Lee Wilson. I live in Santa Fe, and I am writing because I am concerned about the risks and harms Project Jupiter poses to New Mexicans. I am submitting this comment to urge the New Mexico Environment Department to reject ...↓
No attachments

Comment From: M C

7/06/26 @ 7:31 PM
The Yucca Growth Infrastructure will take and ruin the already limited environmental resources we have. We are running out of water and we cannot live without water or air. New Mexican lives are worth so much more than a data center.
No attachments

Comment From: gregory Sandoval

7/06/26 @ 7:30 PM
Project Jupiter's microgrids will result in destructive environmental and climate impacts, worsen ozone pollution and violate community health standards in a region where the people will suffer health impacts directly related to the emissions from th...↓
No attachments

Comment From: Kathleen Fuchs

7/06/26 @ 7:30 PM
I am opposed to Project Jupiter.
New Mexico is already suffering the effects of climate change. Drought and increasing temperatures are already impacting our land, our waterways, and our air quality. Huge data centers are only making the climate cri...↓
No attachments

Comment From: Tracy Winslow

7/06/26 @ 7:29 PM
I urge the Board not to approve this air quality construction permit for a new data center in Las Cruces. Building large data centers in the desert is irresponsible and short-sighted. Southern New Mexico is already facing severe water scarcity, and c...↓
No attachments

Comment From: Sen. Harold Pope Jr.

7/06/26 @ 7:27 PM
The New Mexico Environment Department must reject the air quality permit for Project Jupiter.

Our communities should not have to sacrifice clean air, public health, and precious natural resources for a project that raises serious concerns about poll...↓
No attachments

Comment From: Hannah Widner

7/06/26 @ 7:26 PM
My name is Hannah Widner; and as a lifelong resident of Doña Ana county I am strongly opposed to the approval of an air quality construction permit for the Yucca Growth Infrastructure, LLC. Air quality concerns have long plagued Doña Ana county and t...↓
No attachments

Comment From: Nicole Waltermire

7/06/26 @ 7:26 PM
Attachments:

Comment From: Heather Cowan

7/06/26 @ 7:26 PM
I grew up in las cruces and still visit family and friends there often. Please deny any and all permits for this project and for any future data centers, AI projects/companies, large scale servers - any construction where the water use will go to mac...↓
No attachments

Comment From: David Baake

7/06/26 @ 7:25 PM
On behalf of the Rio Grande Chapter of the Sierra Club, we write to respectfully offer additional technical comments on the above-referenced permit application ("Application") for Project Jupiter's Power Plant (the "Project"). We join comments that C...↓
Attachments:

Comment From: guthrie miller

7/06/26 @ 7:24 PM
I oppose project jupiter and the proposed fuel cell electricity plant.
More fossil-fuel-generated electricity for AI data centers does not serve the people of NM, it serves owners of these plants.
No attachments

Comment From: anonymous anonymous

7/06/26 @ 7:24 PM
"Please save our river, we need to figure out ways to make sure the water stays flowing and enough for our communities; human and other beings living with us, the fish, the insects, arachnids, the bugs, the snails, the frogs, toads, the porcupines, t...↓
No attachments

Comment From: Izabella Ortiz

7/06/26 @ 7:23 PM
I don't not support the building and expansion of project Jupiter or any facility related to this company. I do not support ai data centers and I do not support project Jupiter
No attachments

Comment From: Alexandria Rakes

7/06/26 @ 7:23 PM
Deny this permit. This data center is actively causing harm already and it is not even built yet. This data center WILL harm our environment; not a maybe but a definitely! This cannot happen in the delicate climate/delicate ecology of New Mexico.
No attachments

Comment From: Karen Sivils

7/06/26 @ 7:23 PM
"am a resident of Las Cruces and I am asking that you deny Yucca Growth Infrastructure's air quality permit. I live here with many generations of my family and this is our home. I want to continue raising my children here knowing they have a safe and...↓
No attachments

Comment From: Jasmine Flores

7/06/26 @ 7:22 PM
No one wants this AI DATA CENTER! AKA surveillance center
No attachments

[ Previous Page / Next Page ]