Yucca Growth Infrastructure, LLC-YGI Microgrid Air Quality Construction Permit Application

17421 Results

Sort:

Comment From: Maria Cruz

6/14/26 @ 3:41 PM
It's disgusting that commissioners are selling out the public for their own gains! We don't need ai or data centers! We are under a drought as it is and to give private entities more of our valuable resources for their stupid centers is absolutely ho...
No attachments

Comment From: Sophie Kelly

6/14/26 @ 1:44 PM
Do not build an AI data center here, this is a huge waste of money and resources that would be much better spent on other infrastructure projects. This is a completely irrational and purely profit driven.
No attachments

Comment From: Carlos McMahon

6/14/26 @ 12:24 PM
I do not believe that are (already "limited") resources and air quality should be further impacted. We are going to make this world to difficult to live in. For what, so that the Multi-Billionaires can pocket the profits while we will one day struggl...
No attachments

Comment From: Abbey Henley

6/14/26 @ 12:04 PM
As a New Mexican homeowner and true lover of the outdoors, this is an extremely detrimental situation to bring to the picture. This Data Center is being put into a severely overburdened and drought ridden state, surrounded by people who have had to l...
No attachments

Comment From: Aela Culver

6/14/26 @ 11:38 AM
Reject Project Jupiter! Our water, our air, our lands are not for the use of corporations to make money, they are for everyone to live. No matter the strategy and no matter how it's spun, AI data centers are extractive and harmful to the lands, Wildl...
No attachments

Comment From: Linda Sperling

6/14/26 @ 10:47 AM
The people of Dona Ana County cannot "drink data" nor can they breathe 10.1 million tons of emissions and remain healthy. The strain on water resources that Project Jupiter will bring will diminish the quality of life for all residents of Dona Ana Co...
No attachments

Comment From: Elizabeth Fitter

6/14/26 @ 9:34 AM
Deny this permit. Allowing a data center to be built in the Chihuahuan desert would negatively impact the entire state. New Mexico's people and resources are not available for corporations to exploit.
No attachments

Comment From: Shelley Alonso-Marsden

6/14/26 @ 9:00 AM
As a NM resident, I'm very concerned about the environmental impacts of Project Jupiter, which I don't think will have economic benefits commensurate with the severe environmental costs.
No attachments

Comment From: Barbara Wisoff

6/14/26 @ 8:46 AM
No Data Centers in New Mexico. The so called "Job Fair" is a gaslighting avoidance of accountability and transparency to push through the Jupiter Project data center despite repeated protests by New Mexicans. Data centers usurp our scarce water sup...
No attachments

Comment From: Miss April Nastasi

6/13/26 @ 11:52 PM
Public Comment – Air Quality Construction Permit Application 10883
Yucca Growth Infrastructure LLC (YGI) Microgrid
To the New Mexico Environment Department Air Quality Bureau,
My name is April Tina Nastasi, and I am a resident of New Mexico subm...
No attachments

Comment From: Niki Cordova

6/13/26 @ 4:28 PM
I'm asking that you please say no to the permits on this project. The people of New Mexico don't want to loose our drinking water. The Rio Grande River looks horrible and our farming communities are also suffering. Please keep New Mexico clean and ou...
No attachments

Comment From: Zane Chaffee

6/13/26 @ 3:59 PM
New Mexico dosent need or want data centers!
No attachments

Comment From: Kraig Menefee

6/13/26 @ 2:23 PM
Fuck AI, fuck the people trying to poison our people and land and animals with their data centers.
No attachments

Comment From: dhaval shah

6/13/26 @ 1:10 PM
This project will affect not only the air quality but the health of thousands of people living in the community. For which this project should not be proceeded with.
No attachments

Comment From: Jayson Schlobohm

6/13/26 @ 12:56 PM
Please do not allow our air and water to be polluted by Yucca Growth or the data center.
No attachments

Comment From: Anastasia Walhovd

6/13/26 @ 12:30 PM
Please deny this permit. The amount of emissions for this permit will dramatically effect in a negative way human health and environment health. Air quality in this area of the state is already some of the worst in the entire United States and I cann...
No attachments

Comment From: Laura Cardenas

6/13/26 @ 11:36 AM
Dear NMED staff,

My name is Laura Cardenas. I am a New Mexico resident, living in Las Cruces, and I am writing because I am concerned about the risks and harms Project Jupiter poses to New Mexicans. I am submitting this comment to urge the New Mexic...
No attachments

Comment From: Matthew Mendez

6/13/26 @ 10:25 AM
Dear NMED staff,

My name is Matthew. I am a New Mexico resident, living in Las Cruces, and I am writing because I am concerned about the risks and harms Project Jupiter poses to New Mexicans. I am submitting this comment to urge the New Mexico Envir...
No attachments

Comment From: Katelynn Ruspoli

6/13/26 @ 10:23 AM
Dear NMED staff,

My name is Katelynn. I am a New Mexico resident, living in Las Cruces, and I am writing because I am concerned about the risks and harms Project Jupiter poses to New Mexicans. I am submitting this comment to urge the New Mexico Envi...
No attachments

Comment From: Robert Walsh

6/13/26 @ 10:17 AM
I am against this project because of the eventual water usage which will impact all residents and agriculture.
No attachments

Comment From: Bryanna Hutchinson

6/13/26 @ 9:51 AM
Attachments:

Comment From: Kathleen Walsh

6/13/26 @ 8:49 AM
Agua es vida! We don't need or want a data center! We need our water and peace of mind. We don't want it stealing our electricity and making us pay for it. We don't want the noise it generates. Please save our water!
No attachments

Comment From: Lucy Birkhead

6/13/26 @ 8:39 AM
This latest change by the minds behind Project Jupiter is still very much NOT what the people of New Mexico want. Switching to fuel cell technology does not change the outcome for our state and its people. Poor air quality and toxic waste which ruins...
No attachments

Comment From: Maya W

6/13/26 @ 8:03 AM
In regards to permit no. 10883: The absolute last thing we need is more pollution and less water and that's all the YGI microgrid will bring. Yucca Growth Infrastructure is not welcome in New Mexico. I implore you to hold a public hearing on this mat...
No attachments

Comment From: Olivia Romero

6/13/26 @ 5:35 AM
Water cannot be used for an AI data center that we ourselves barely have in a drought stricken state!!! Where is your accountability??
No attachments

Comment From: Analee Gutierrez

6/13/26 @ 12:52 AM
New Mexico is my home, I've lived here my whole life and is now raising my child in the same home I've loved. We have no guarantee that these data centers won't be harmless in the long run especially to our already limited water. Please don't agree t...
No attachments

Comment From: Taylor Warner

6/12/26 @ 10:20 PM
I urge that this permit be denied. Project Jupiter does not care about the people of New Mexico, our water, our air, or our future. The people of New Mexico STRONGLY oppose this data center, how much more evidence do you need? It would be morally rep...
No attachments

Comment From: Ashelyn Bryer

6/12/26 @ 7:35 PM
I do not support any form of Microgrid or data center development in my state.
No attachments

Comment From: Madeline Rappaport-Blazejewska

6/12/26 @ 7:21 PM

I am submitting this comment to share my opposition to the Yucca Growth Infrastructure, LLC-YGI Microgrid Air Quality Construction Permit Application. Please deny this application for the following reasons:

*YGI's application should be denied by NM...
No attachments

Comment From: Ann Montoya

6/12/26 @ 6:22 PM
I live closer to Santa Theresa than down town El Paso. I urge you to hold an open public meeting about air quality. This border area will become so toxic it will be worthless. You know our air quality is very very poor at times. Dont succumb to the ...
No attachments

Comment From: Leyla Porras

6/12/26 @ 3:59 PM
To whom this may concern, Project Jupiter will detrimentally hurt the environment of New Mexico. New Mexico has a diverse landscape that is already struggling through a drought. Water in NM does not need to be wasted on a ridiculous center that is th...
No attachments

Comment From: Alexander Wallack

6/12/26 @ 3:35 PM
Issues with Air Permit

Massive greenhouse gas pollution
Project Jupiter's power plant will release up to 10 million tons – 20 billion pounds – of climate-warming greenhouse gasses every year. This will make a mockery of our climate goals, and erase ...
No attachments

Comment From: Rob Wood

6/12/26 @ 2:09 PM
I am writing to express my support for Project Jupiter, which I believe offers significant benefits for our community.

Project Jupiter is poised to bring substantial economic growth to Doa Ana County. It is anticipated to create 4,000 construction ...
No attachments

Comment From: Jeffrey White

6/12/26 @ 1:48 PM
I am writing to express my support for Project Jupiter, which I believe offers significant benefits for our community.

Project Jupiter is poised to bring substantial economic growth to Doa Ana County. It is anticipated to create 4,000 construction ...
No attachments

Comment From: Todd Miller

6/12/26 @ 1:47 PM
Dona Ana County is starving for innovative jobs and business, I have an Industrial Hygiene-EHS background, and understand the systems. I built similar chemical plants with scrubbers, cogen, bio-capture, rain water management in India, Indonesia, Saud...
No attachments

Comment From: William Thomas

6/12/26 @ 1:46 PM
I am writing to express my support for Project Jupiter, which I believe offers significant benefits for our community.

Project Jupiter is poised to bring substantial economic growth to Doa Ana County. It is anticipated to create 4,000 construction ...
No attachments

Comment From: Shannon Reynolds

6/12/26 @ 1:46 PM
I am writing to express my support for Project Jupiter, which I believe offers significant benefits for our community.

Project Jupiter is poised to bring substantial economic growth to Doa Ana County. It is anticipated to create 4,000 construction ...
No attachments

Comment From: Stephen E Conn

6/12/26 @ 1:46 PM
I am writing to express my support for Project Jupiter, which I believe offers significant benefits for our community.

Project Jupiter is poised to bring substantial economic growth to Doa Ana County. It is anticipated to create 4,000 construction ...
No attachments

Comment From: William Bartlett

6/12/26 @ 1:45 PM
I am writing to express my support for Project Jupiter, which I believe offers significant benefits for our community.

Project Jupiter is poised to bring substantial economic growth to Doa Ana County. It is anticipated to create 4,000 construction ...
No attachments

Comment From: Avelina Bardwell MD

6/12/26 @ 1:38 PM
I am a physician and am worried about the environmental damage that will be incurred by Project Jupiter that will not be limited to the people in Dona Ana County but will extend much further. The project developers are trying to address this by sh...
No attachments

Comment From: Kaylee Romero

6/12/26 @ 1:08 PM
Dear NMED staff, 
My name is Kaylee Romero. I am a New Mexico resident, living in the east mountains of Albuquerque, and I am writing because I am concerned about the risks and harms Project Jupiter poses to New Mexicans. I am submitting this comment...
No attachments

Comment From: Serena Nickell

6/12/26 @ 7:58 AM
Dear NMED staff,
My name is Serena. I am a New Mexico resident, living in Santa Fe, and I am writing because I am concerned about the risks and harms Project Jupiter poses to New Mexicans. I am submitting this comment to urge the New Mexico Environm...
No attachments

Comment From: Eduardo Rodriguez

6/12/26 @ 7:32 AM
I am writing to express my support for Project Jupiter, which I believe offers significant benefits for our community.

Project Jupiter is poised to bring substantial economic growth to Doa Ana County. It is anticipated to create 4,000 construction ...
No attachments

Comment From: Gerardo Fierro

6/12/26 @ 7:32 AM
I am writing to express my support for Project Jupiter, which I believe offers significant benefits for our community.

Project Jupiter is poised to bring substantial economic growth to Doa Ana County. It is anticipated to create 4,000 construction ...
No attachments

Comment From: Christina Avila

6/12/26 @ 7:32 AM
I am writing to express my support for Project Jupiter, which I believe offers significant benefits for our community.

Project Jupiter is poised to bring substantial economic growth to Doa Ana County. It is anticipated to create 4,000 construction ...
No attachments

Comment From: Lucas Woodruff

6/12/26 @ 7:31 AM
I am writing to express my support for Project Jupiter, which I believe offers significant benefits for our community.

Project Jupiter is poised to bring substantial economic growth to Doa Ana County. It is anticipated to create 4,000 construction ...
No attachments

Comment From: Linda Zat

6/12/26 @ 7:31 AM
I am writing to express my support for Project Jupiter, which I believe offers significant benefits for our community.

Project Jupiter is poised to bring substantial economic growth to Doa Ana County. It is anticipated to create 4,000 construction ...
No attachments

Comment From: Emily Valdez

6/12/26 @ 7:31 AM
I am writing to express my support for Project Jupiter, which I believe offers significant benefits for our community.

Project Jupiter is poised to bring substantial economic growth to Doa Ana County. It is anticipated to create 4,000 construction ...
No attachments

Comment From: Enrique Frescas-Gutierrez

6/12/26 @ 7:30 AM
I am writing to express my support for Project Jupiter, which I believe offers significant benefits for our community.

Project Jupiter is poised to bring substantial economic growth to Doa Ana County. It is anticipated to create 4,000 construction ...
No attachments

Comment From: Michael Latorra

6/12/26 @ 7:30 AM
I am writing to express my support for Project Jupiter, which I believe offers significant benefits for our community.

Project Jupiter is poised to bring substantial economic growth to Doa Ana County. It is anticipated to create 4,000 construction ...
No attachments

Comment From: Alysha Blaylock

6/12/26 @ 7:09 AM
Water is a precious resource, and our air and land is a commodity we do not need to sell out to large corporations to make billions, to make New Mexicans suffer. Please say no and reject project Jupiter we do not need their money, their limited jobs,...
No attachments

Comment From: Suzanne Valentine

6/12/26 @ 7:04 AM
Every time this company and Project Jupiter changes their name or claims of what effect their activity would have on New Mexico, they become more obvious in their disdain for the people of this state. I see their AI advertisements on tv where they sh...
No attachments

Comment From: Alex Ornelas

6/12/26 @ 6:54 AM
Please do not sell our already very limited natural resources to these billion dollar companies by allowing them to build data centers in New Mexico. New Mexicans do not want our land, water, and safety sold off to the highest bidder. Do the right th...
No attachments

Comment From: Samantha Storz

6/11/26 @ 10:49 PM
Dear NMED,
My name is Samantha Storz. I am a New Mexico resident, living in Truth or Consequences, and I am writing because I am concerned about the risks and harms Project Jupiter poses to New Mexicans. I am submitting this comment to urge the New ...
No attachments

Comment From: Christina Welch

6/11/26 @ 8:36 PM
I speak for myself, my friends, and family when I say, I will lose the respect and ability to vote for any person who backs and or approves this application. I long for a clean planet and I cannot support something that isn't in line with clean energ...
No attachments

Comment From: April Rubio

6/11/26 @ 6:31 PM
Do not approve this permit. No more data centers in underprivileged communities.
No attachments

Comment From: Gurumustuk Khalsa

6/11/26 @ 6:04 PM
A few grounded points I worked into the comment: the NMED notice identifies this as **Permit No. 10883** for a microgrid about **3.6 miles south of Santa Teresa**, and says it would be a **major Title V source** powered by natural gas fuel cells. NME...
No attachments

Comment From: Cynthia Archuleta

6/11/26 @ 5:04 PM
I am do NOT want the application for Yucca infrastructure to go through for Project Jupiter! I am asthmatic and moved here for the air quality. They will still be using natural gas and an unknown amount of emissions will still be emitted long after...
No attachments

Comment From: Timothy Olinzock

6/11/26 @ 3:04 PM
If we are to Survive and Thrive as Human Beings we must think about the next 7 generations. Water is Life and without it we sign our own demise.
No attachments

Comment From: Gabrielle Villavicencio

6/11/26 @ 2:12 PM
Dear NMED staff,

My name is Gabrielle Villavicencio. I am a New Mexico resident, living in Albuquerque, and I am writing because I am concerned about the risks and harms Project Jupiter poses to New Mexicans. I am submitting this comment to urge the...
No attachments

Comment From: Jackson Shirley

6/11/26 @ 12:41 PM
This data center would more than double the energy usage and pollution already generated by major cities in New Mexico. With its already dry landscape, New Mexico cannot afford to lose more water. Just a few weeks ago there were families on the reser...
No attachments

Comment From: Ryder Hobbs

6/11/26 @ 12:35 PM
Dear NMED staff,
My name is Ryder Hobbs. I am a New Mexico resident living in Albuquerque. I am writing because I am concerned about the risks and harms Project Jupiter poses to New Mexicans. I am submitting this comment to urge the New Mexico Envir...
No attachments

Comment From: Logan Monroe

6/11/26 @ 12:27 PM
Attachments:

Comment From: Emily Dodson

6/11/26 @ 12:20 PM
While this may be a revised plan after previously denied plans were found to use excessive state resources while causing significant ecological harm, this new proposal still uses our already scarce state resources at a significant cost to our people ...
No attachments

Comment From: Isabelle Gauthier

6/11/26 @ 12:08 PM
DENY THE APPLICATION!!!! Save the future generations from smog and acid rain and water scarcity. Eat the rich. Save our planet before it's too late.
No attachments

Comment From: Kelly Roepke-Orth

6/11/26 @ 10:41 AM
Attachments:

Comment From: Keegan Boyle

6/11/26 @ 10:26 AM
This project is extremely unpopular - for good reason - and this permit should not be approved without a reasonable chance for community involvement. The way that the county has handled this entire process has not been transparent, and we the people ...
No attachments

Comment From: Ruby Renteria

6/11/26 @ 10:00 AM
Reject these permits for project Jupiter we do not need a massive AI center in New Mexico. We will lose the little water we have and more green house emissions will be released polluting our beautiful state. This will not be beneficial in the slighte...
No attachments

Comment From: Carly Baca

6/11/26 @ 7:30 AM
I, Carly Baca, a community member of Albuquerque, email to inform you I oppose allowing further expansion of data centers and their working parts. The impact a center at this scale is detrimental to the wildlife and our community members that live in...
No attachments

Comment From: Alexandra Clark

6/11/26 @ 6:28 AM
Dead NMED staff,
My name is Alexandra and I am writing to you about my concerns Project Jupiter poses to our great state. I am a Las Cruces resident and understand the impact this project has on all of us living here. I am submitting this comment to...
No attachments

Comment From: Patricia Isaacs

6/11/26 @ 1:48 AM
Dear NMED staff,

My name is Patricia Isaacs. I am a New Mexico resident, living in Clayton, NM, and I am writing because I am concerned about the risks and harms Project Jupiter poses to New Mexicans. I am submitting this comment to urge the New Me...
No attachments

Comment From: Cheryl Tomlin

6/10/26 @ 11:05 PM
Dear NMED staff,
I am a New Mexico resident, living in Albuquerque, and I am writing because I am concerned about the risks and harms Project Jupiter poses to New Mexicans. I am submitting this comment to urge the New Mexico Environment Department to...
No attachments

Comment From: Ellery Wagner

6/10/26 @ 9:12 PM
Deny this permit application. We do not need this project in our community!
No attachments

Comment From: Lilliana Salcido

6/10/26 @ 8:08 PM
We need our water!!
No attachments

Comment From: Alex Dobbins

6/10/26 @ 7:34 PM

Dear NMED staff,

Please keep NM our HOME. Please do not let billionaires rape our communities and destroy one of the most beautiful places on Earth. My name is Alex Dobbbins. I am a New Mexico resident, living in Albuquerque, and I am writing becaus...
No attachments

Comment From: Jovanna Nanez

6/10/26 @ 6:02 PM
New Mexico does not need a data center and more pollution. We need water and clean air to raise healthy children. Stop thinking about your wallets. Money wont do you or your families any good if the earth is dead and depleted.
No attachments

Comment From: Cole Grosland

6/10/26 @ 5:55 PM
As a local resident, these requested emission limits are deeply concerning, as is the sudden and unexplained pivot from combustion to SOFC energy sourcing. If YGI and Bloom are confident in their lack of PM emissions as cited in their application, th...
No attachments

Comment From: Anjalina Barclay

6/10/26 @ 5:46 PM

Dear NMED staff,
My name is Anj Barclay. I am an Alamogordo, NM resident. I am writing because I am concerned about the risks and harms Project Jupiter poses to New Mexicans, and to the environment. I am submitting this comment to urge the New Mexico...
No attachments

Comment From: Alex Maas

6/10/26 @ 4:47 PM
Dear NMED staff,

My name is Alex Maas. I am a New Mexico resident, living in Albuquerque and Santa Fe, and I am writing because I am concerned about the risks and harms Project Jupiter poses to New Mexican's. I am submitting this comment to urge th...
No attachments

Comment From: Elvira Esparza Bencomo

6/10/26 @ 4:09 PM
As a resident of Dona Ana county I STRONG OPPOSE Project Jupiter. The are more negative effects to community, people, and environment if this project was to be able to move forward.

We are in a severe drought and a data center that big will make th...
No attachments

Comment From: Grace Mason

6/10/26 @ 4:05 PM
Allowing project Jupiter to proceed would an egregious trespassing on already incredibly limited water resources and our fragile environment. The corporate greed pushing the project forward needs to go elsewhere, not New Mexico. The potential for env...
No attachments

Comment From: Orion Martinez

6/10/26 @ 3:36 PM
We cannot allow those who do not care for us or our land to complete this disastrous project. There are plenty live examples of the negative and harsh living conditions that those who you do not care to acknowledge, are currently suffering through. W...
No attachments

Comment From: Adriana Tatum

6/10/26 @ 2:53 PM
We do not need project Jupiter in New Mexico. New Mexico needs water not more data centers. The AI bubble is about to pop and the waste and damage all these data centers our doing to our communities will be for nothing. Don't sell out New Mexico just...
No attachments

Comment From: Dennis Cochlin

6/10/26 @ 2:53 PM
I am writing to express my support for Project Jupiter, which I believe offers significant benefits for our community.

Project Jupiter is poised to bring substantial economic growth to Doa Ana County. It is anticipated to create 4,000 construction ...
No attachments

Comment From: Rebecca Peterson

6/10/26 @ 2:52 PM
Reject the emissions application by Jupiter Project. I demand public hearings on this matter, & transparency. This affects air quality in our entire state.
No attachments

Comment From: Freddie Jaramillo

6/10/26 @ 1:51 PM
Please do NOT accept this proposal. Our state is already struggling with water and waste, this is just something that would completely disrupt turn community and make living conditions worse for everybody.
No attachments

Comment From: Rosha Asher

6/10/26 @ 1:35 PM
NO AI DATA CENTERS IN OUR STATE. The harm it will cause will never be worth the useless AI tools being forced on us.
No attachments

Comment From: Howard Korder

6/10/26 @ 1:34 PM
I strongly oppose granting an air quality permit for Project Jupiter as it is currently constituted. Its initial proposal to use gas turbines for power generation would have produced 14 million tons of greenhouse gases, according to its own documenta...
No attachments

Comment From: W Thomas Jones

6/10/26 @ 1:20 PM
Yucca Growth Infrastructure and Project Jupiter should not be allowed to use natural gas fuel cells because they still pollute too much. Solar and batteries, much cheaper and much improved lately, can provide the bulk of this project's power. Power f...
No attachments

Comment From: Elizabeth Lucero

6/10/26 @ 12:33 PM
It goes against culture and the community to approve the development of Project Jupiter. The Data center gets built, then what? No water for communities and New Mexicans die. They get sick, they leave. Then the state is a wasteland. Approving Project...
No attachments

Comment From: Amy Larsen

6/10/26 @ 12:19 PM
Dear NMED,
I'm providing a public comment in opposition to the permit application for "Yucca Growth Infrastructure, LLC-YGI Microgrid Air Quality Construction". As a lifelong resident of New Mexico, I have concerns about the impacts to the environme...
No attachments

Comment From: Michael Pitula

6/10/26 @ 12:16 PM
I oppose this project, because I do not believe it is in the best interest of the state's residents. It demands water we do not have.It would exceed emissions targets we need tobstay below to avoid the worst consequences of runaway climate change. I ...
No attachments

Comment From: Steve Castillo

6/10/26 @ 11:30 AM
After some reading about Project Jupiter, and in particular seeing that Project Jupiter will be using non potable water for system cooling and is going with the Bloom fuel cells rather than gas turbines for electricity generation and is not solely be...
No attachments

Comment From: Leroy Levine

6/10/26 @ 11:23 AM
I strongly feel that any water utilization needs to be strictly controlled in a state that has severely overutilized the amount of water available to us all... something of this size should only ever be powered with a green source of energy so is to ...
No attachments

Comment From: Trinity Blom

6/10/26 @ 11:14 AM
No data centers in New Mexico. If our state is committed to fighting climate change then it will say no to a data center that will produce more greenhouse gases than the three largest cities of New Mexico combined. I also have massive concerns regard...
No attachments

Comment From: Margaret Govoni

6/10/26 @ 10:30 AM
No proposed projects that would use massive amounts of water should ever be considered in New Mexico, not to mention all of the other ways this would be disastrous for NM. Albuquerque was just listed as one of the worst areas for air quality, and now...
No attachments

Comment From: April Porter

6/10/26 @ 9:30 AM
I write this great urgency and concern... Please do not grant an air quality permit to Project Jupiter now or ever! Shut down any possibility of having a data center in New Mexico. We just don't have the water, and we don't want the air and water p...
No attachments

Comment From: Vincent Defibaugh-Chavez

6/10/26 @ 9:06 AM
Please, don't take away our water and air for a surveillance data center. AI is not necessary. Project Jupiter was and will never be necessary.
No attachments

Comment From: Indira Aguirre

6/10/26 @ 8:46 AM
I would like to know how exactly Yucca Growth Infrastructure determined that they are not within the bounds of distance requirements from the Fort Sill Apache area that is the location of the federally recognized Chiricahua Apache and Warm Springs Ap...
No attachments

Comment From: Leslie Zane

6/10/26 @ 8:39 AM
This proposal will desecrate land, use up to one million gallons of water in a drought afflicted state, will add a windowless huge box in land that has been unfettered for 1000s of years. And for what? Seriously, for what? So tech billionaires can ma...
No attachments